Full assessment
Complete evaluation of performance and maturity, with in-depth line observations within the chosen scope.

Complexity often creeps in after a management change, outsourcing or uncontrolled volumes. The answer is to simplify, strengthen the foundations and routines, and reconnect with the shop floor.

Eric Le Bourdon
Industrial performance consultant and trainer
Bordeaux · France and international
not only to the head.
because nothing lasts without them.
because it is the only way to get different results.
Four steps, from assessment to lasting results. Each step builds on the previous one: breakthroughs don't last on unstable foundations.
Shared vision and alignment across departments.
Stability through management routines.
Targeted projects on the biggest losses.
Standardised activities and preventive management.

Performance (safety, morale, quality, delivery, cost, environment) starts with stability. Once variation is under control, targeted projects raise the level for good.
From a targeted assessment to a full evaluation, so you can start at the level that fits.
Complete evaluation of performance and maturity, with in-depth line observations within the chosen scope.

Targeted snapshot of the Maintenance process.

A shop-floor visit to identify the first quick wins and improvement opportunities.

The assessment always follows the process, not the departments, from the shop floor up to senior management.
Six dimensions assessed in one week. The evaluation follows the process, never the boundary between Production and Maintenance.
Maintenance and Production organisation: teams, structures and daily routines on both sides.
5S strategy and deployment, spare parts and continuous improvement.
Breakdown rate and use of data, prioritisation of problem solving.
Effectiveness of preventive and autonomous maintenance, management and follow-up.
Management routines linking the four previous dimensions.
Skills matrix, training plan, management of subcontractors and budget.
Strengths and areas for improvement, benchmark positioning, and a tailored roadmap of logically sequenced improvement projects.
Site values are fictitious, for illustration only. Thresholds from the Agilean beverage and bottling benchmark (iFactoryApp 2026, f7i.ai 2026, field experience).
Foundation and/or breakthrough projects, run in the plant with the teams, with measured results.

70 % of a unit's activities and risk situations can be improved through better working conditions, with 5S and visual management. It is the foundation of stability: everything in its place, every deviation visible at a glance.

70 % non-value-added activities cause a 30 % productivity loss. The 3M method improves labour efficiency and removes quality errors caused by methods and people, by involving shop-floor teams along three lines:
Results: 90 % of losses in productivity and quality caused by people or methods eliminated, +30 % productivity, ROI 4:1, better ergonomics, safety and motivation
Example from a typical workstation analysis (Agilean Muda / ECRS tool).
Every task at the workstation is timed, then classified as value added, semi value added or non value added. ECRS then deals with the losses in this order:
Result: non-value-added time per cycle cut by 51 %, from 13.5 to 6.7 minutes

Move from what you see to what actually happened, to focus and simplify the analysis. Apply the 3G quickly: on the shop floor, on real data, on the faulty part.

OEE loss deployment, basic conditions, standard work and settings, problem solving: operators become the guardians of their machines.
Result: minor stoppages < 5 %

Maintenance strategy defined by equipment criticality, breakdown analysis, review of maintenance plans, spare parts management, overhaul optimisation.
Results: breakdowns < 6 %, planned downtime < 5 %, planned work orders completed > 90 %

Filmed analysis of the changeover, separation of internal and external tasks, new standard built with the teams.
Result: changeover reduced from 146 to 63 minutes


A cascade of short meetings, from teams to site management (Top 5, Top 15, Top 30), to deal with deviations the same day and escalate what needs escalating.


Different functions brought together around one visual wall (milestones, risks, decisions), with joint steering, in one place and at short intervals. The approach applies to:
Result in industrialisation: faster new product launches, lead time cut by 20 %
Corporate career and consulting assignments:

Former Operational Excellence director and TPM coordinator in France and abroad, I have deployed complete Lean systems and zero-loss cultures from launch, in packaging, inks, beverages, pharmaceuticals and food.
“Eric is an expert in lean TPM, a great coach and an excellent motivator. His clarity of thinking turns problems that seem huge into problems so small that the solution looks obvious to implement.”
“Eric supported the lean journey in my plant. He passed his enthusiasm and energy on to the whole team, with concrete results well beyond the foundations laid.”
My full experience and all recommendations are on my LinkedIn profile.
View my LinkedIn profileRecent assignments and what I take away from them, every quarter. (Newsletter in French.)
Four projects carried out this quarter with industrial clients, for lasting improvements in their results.
Pharmaceutical industry · FranceAfter a full assessment, simpler processes and optimised routines freed up the time leaders needed to return to the shop floor (Gemba) and build a problem-solving culture.
Pharmaceutical industry · FranceFull assessment of technicians' activities and main processes. Next steps: fewer indirect tasks, requirements reviewed to what is needed, team autonomy and versatility.
Pharmaceutical industry · FranceOver 40 people trained in problem-solving techniques across several Quality teams, to understand the phenomenon on the shop floor and focus the analysis.
Animal health · SpainRoadmap being validated: schedule stability, performance management, changeover reduction, engagement, right first time.
Engineering schoolA hands-on Lean experience with engineering students: simulations, educational games and lessons from the shop floor.
A selection of my LinkedIn posts on Lean, TPM and performance management (in French). Click a visual to enlarge it.
Assessment, shop-floor support or simply a conversation about your challenges: I reply within 48 hours.
Tell me about your site and your challenges. Together we choose the right assessment level: 2 days, 1 week or 2 weeks.