AgileanCap Excellence
Lean · TPM · Operational excellence

From enduring performance to mastering it.

Complexity often creeps in after a management change, outsourcing or uncontrolled volumes. The answer is to simplify, strengthen the foundations and routines, and reconnect with the shop floor.

Logo Agilean, Cap Excellence

Eric Le Bourdon
Industrial performance consultant and trainer
Bordeaux · France and international

4:1average return on investment
30–50 %reduction of targeted losses
−50 %workplace accidents
−60 %changeover time
What I believe

People at the heart.

Speak to the heart

not only to the head.

Involve people

because nothing lasts without them.

Change the way we work

because it is the only way to get different results.

What this changes in practice

  • Teams define the standards they will apply
  • Results follow from these standardized activities
  • Coaching happens on the shop floor, not in a classroom
  • Kindness and enjoyment rather than the pursuit of perfection
  • An action-oriented approach at every step
Approach

Building performance in the right order.

Four steps, from assessment to lasting results. Each step builds on the previous one: breakthroughs don't last on unstable foundations.

1

Assessment

Shared vision and alignment across departments.

2

Foundations

Stability through management routines.

3

Breakthroughs

Targeted projects on the biggest losses.

4

Sustain

Standardised activities and preventive management.

Stabilise before you break through

Stabilise before you break through

Performance (safety, morale, quality, delivery, cost, environment) starts with stability. Once variation is under control, targeted projects raise the level for good.

Services

Three levels of engagement, to suit your needs.

From a targeted assessment to a full evaluation, so you can start at the level that fits.

Level 1

Full assessment

2 weeks

Complete evaluation of performance and maturity, with in-depth line observations within the chosen scope.

Full assessment
Level 2

Reliability assessment

1 week

Targeted snapshot of the Maintenance process.

Reliability assessment
Level 3

Production line assessment

2 days

A shop-floor visit to identify the first quick wins and improvement opportunities.

Production line assessment

The assessment always follows the process, not the departments, from the shop floor up to senior management.

The method

Example: the maintenance reliability assessment.

Six dimensions assessed in one week. The evaluation follows the process, never the boundary between Production and Maintenance.

I

Organisation

Maintenance and Production organisation: teams, structures and daily routines on both sides.

II

Foundations

5S strategy and deployment, spare parts and continuous improvement.

III

Breakdown analysis

Breakdown rate and use of data, prioritisation of problem solving.

IV

Anticipation

Effectiveness of preventive and autonomous maintenance, management and follow-up.

V

Management

Management routines linking the four previous dimensions.

VI

Skills, budget, subcontracting

Skills matrix, training plan, management of subcontractors and budget.

Deliverables

Strengths and areas for improvement, benchmark positioning, and a tailored roadmap of logically sequenced improvement projects.

Strengths

  • Solid practices identified on the shop floor
  • Teams engaged on some workstreams
  • Routines in place, ready to scale

Areas for improvement

  • Areas with no evidence of the methodology being used
  • Routines still dependent on a few people
  • Little structured follow-up over time

Example: benchmark positioning, beverage and bottling industry

Weak / at riskAverageGoodBest in classSite
Bottling line OEESite : 68%
Changeover time (SMED)Site : 55 min
Scrap / breakage rate (glass, PET, can)Site : 2.1%

Site values are fictitious, for illustration only. Thresholds from the Agilean beverage and bottling benchmark (iFactoryApp 2026, f7i.ai 2026, field experience).

Deliverables
Case studies

After the assessment, targeted projects.

Foundation and/or breakthrough projects, run in the plant with the teams, with measured results.

5S: more than tidying up, a way of working
5S · Visual management · Stability

5S: more than tidying up, a way of working

70 % of a unit's activities and risk situations can be improved through better working conditions, with 5S and visual management. It is the foundation of stability: everything in its place, every deviation visible at a glance.

The 3M method: Muda, Mura, Muri
3M · Breakthrough

The 3M method: Muda, Mura, Muri

70 % non-value-added activities cause a 30 % productivity loss. The 3M method improves labour efficiency and removes quality errors caused by methods and people, by involving shop-floor teams along three lines:

  • Reduce strain (Muri): workstation safety and ergonomics
  • Reduce variability (Mura): restore basic conditions, stabilise the process
  • Reduce non-value-added work (Muda): eliminate unnecessary activities

Results: 90 % of losses in productivity and quality caused by people or methods eliminated, +30 % productivity, ROI 4:1, better ergonomics, safety and motivation

Time breakdown before improvement

Value added (VA)Semi value added (SVA)Non value added (NVA)

Muda before (min per cycle)

Rework5.0
Unpacking2.5
Waiting2.2
Walking1.4
Other0.8
Quality0.5
Body motion0.5
Problem solving0.5

NVA time per cycle −51 %

Before13.5 min
After ECRS6.7 min

Example from a typical workstation analysis (Agilean Muda / ECRS tool).

ECRS · Muda analysis

ECRS: removing non-value activities to raise productivity

Every task at the workstation is timed, then classified as value added, semi value added or non value added. ECRS then deals with the losses in this order:

  • Eliminate tasks with no value (rework, waiting, walking)
  • Combine operations that can be combined
  • Reduce distances, times and complexity
  • Simplify what remains, for an obvious, unambiguous workstation

Result: non-value-added time per cycle cut by 51 %, from 13.5 to 6.7 minutes

A fast and engaging approach
Rapid problem solving

A fast and engaging approach

Move from what you see to what actually happened, to focus and simplify the analysis. Apply the 3G quickly: on the shop floor, on real data, on the faulty part.

DefineFrame the problem and its impact
MeasureEstablish the facts on the shop floor
AnalyseTrace back to root causes
ImproveTest and select solutions
ControlStandardise and sustain the gain
Autonomous maintenance and maintenance optimisation
Autonomous maintenance

Autonomous maintenance and maintenance optimisation

OEE loss deployment, basic conditions, standard work and settings, problem solving: operators become the guardians of their machines.

Result: minor stoppages < 5 %

Maintenance strategy
Maintenance

Maintenance strategy

Maintenance strategy defined by equipment criticality, breakdown analysis, review of maintenance plans, spare parts management, overhaul optimisation.

Results: breakdowns < 6 %, planned downtime < 5 %, planned work orders completed > 90 %

Changeover time reduction
Changeover time optimisation

Changeover time reduction

Filmed analysis of the changeover, separation of internal and external tasks, new standard built with the teams.

Result: changeover reduced from 146 to 63 minutes

Short-interval management and gemba walksShort-interval management and gemba walks
Short-interval management · Gemba

Short-interval management and gemba walks

A cascade of short meetings, from teams to site management (Top 5, Top 15, Top 30), to deal with deviations the same day and escalate what needs escalating.

Getting functions to work together, without silosGetting functions to work together, without silos
Lean team management practice

Getting functions to work together, without silos

Different functions brought together around one visual wall (milestones, risks, decisions), with joint steering, in one place and at short intervals. The approach applies to:

  • Vertical start-up of new equipment: reaching full rate from commissioning
  • New product industrialisation
  • Non-production services

Result in industrialisation: faster new product launches, lead time cut by 20 %

Demanding clients, in France and abroad

Corporate career and consulting assignments:

PechineyHeinekenCarlsbergBecton DickinsonLabeyrie Fine FoodsSanofiTotalEnergiesLISICopelectronicAlivira
Profile

Eric Le Bourdon, 30 years on the shop floor.

Eric Le Bourdon
Based inBordeaux, working across France and internationally
LanguagesFrench, English (3 years in Hong Kong), Spanish (6 years in Spain)
EducationChemical engineer, École Supérieure de Chimie Industrielle de Lyon
CareerPechiney, Heineken, Carlsberg, Becton Dickinson, Labeyrie

Former Operational Excellence director and TPM coordinator in France and abroad, I have deployed complete Lean systems and zero-loss cultures from launch, in packaging, inks, beverages, pharmaceuticals and food.

Key skills

  • Former Operational Excellence director, TPM coordinator in France and abroad
  • Shop-floor coaching and problem solving
  • Project management and change management
  • Lean maturity audits and assessments
  • Production management and plant management

Tools deployed in workshops

HoshinLoss deployment5SSafetyVisual managementProblem solvingRoot cause analysisBreakdown reductionQuality defect reductionSMEDTPM3M analysisLine balancingEarly Equipment ManagementFlow / just-in-timeShort-interval managementGemba walksAutonomous production unitsSwimlaneObeya
Testimonials

What people who worked with me say.

“Eric is an expert in lean TPM, a great coach and an excellent motivator. His clarity of thinking turns problems that seem huge into problems so small that the solution looks obvious to implement.”

Vy Van Hi - Continuous Improvement Manager

“Eric supported the lean journey in my plant. He passed his enthusiasm and energy on to the whole team, with concrete results well beyond the foundations laid.”

Audrey Davin - Plant Manager

My full experience and all recommendations are on my LinkedIn profile.

View my LinkedIn profile
News

The Agilean newsletter.

Recent assignments and what I take away from them, every quarter. (Newsletter in French.)

Newsletter · June 2026

The last assignments before a well-earned summer

Four projects carried out this quarter with industrial clients, for lasting improvements in their results.

Overhaul of maintenance practicesPharmaceutical industry · France

Overhaul of maintenance practices

After a full assessment, simpler processes and optimised routines freed up the time leaders needed to return to the shop floor (Gemba) and build a problem-solving culture.

Quality control productivityPharmaceutical industry · France

Quality control productivity

Full assessment of technicians' activities and main processes. Next steps: fewer indirect tasks, requirements reviewed to what is needed, team autonomy and versatility.

Building a problem-solving mindsetPharmaceutical industry · France

Building a problem-solving mindset

Over 40 people trained in problem-solving techniques across several Quality teams, to understand the phenomenon on the shop floor and focus the analysis.

Productivity assessmentAnimal health · Spain

Productivity assessment

Roadmap being validated: schedule stability, performance management, changeover reduction, engagement, right first time.

Teaching Lean to future engineersEngineering school

Teaching Lean to future engineers

A hands-on Lean experience with engineering students: simulations, educational games and lessons from the shop floor.

Get the next newsletter

Once a quarter, by e-mail. Write to me to subscribe.

LinkedIn posts

Ideas I share.

A selection of my LinkedIn posts on Lean, TPM and performance management (in French). Click a visual to enlarge it.

Contact

Want to talk about your next projects?

Assessment, shop-floor support or simply a conversation about your challenges: I reply within 48 hours.

AreaBordeaux, Mont-de-Marsan, all of France and abroad

A first conversation, no commitment

Tell me about your site and your challenges. Together we choose the right assessment level: 2 days, 1 week or 2 weeks.